Passengers travelling to and from King Shaka International Airport in Durban have been urged to prepare for a planned power shutdown simulation scheduled for Thursday morning.
The exercise will take place between 10am and 11am and is aimed at assessing the airport's ability to respond to power outages.
In a statement, the airport said the mandatory simulation would evaluate the performance of its electrical systems and test existing contingency plans to ensure operational readiness during potential power disruptions.
“During the shutdown, certain airport processes will be done manually and essential services will remain operational through backup generators,” the airport said.
Passengers have been asked to exercise patience and allow for possible disruptions while the exercise is under way.
The airport assured travellers that essential services would remain operational throughout the simulation.